Skip to main content
A control is proved two ways, and Cybreeze keeps them strictly apart.
If a machine can check it, it is a validation. If only a person can show it, it is evidence. A validation result is never filed as evidence, and an uploaded document is never a validation.

Validation runs

A validation does not run once. It runs on a schedule and leaves a run behind each time: the verdict, how much it covered, and exactly which users or resources failed. That string of runs is the point. An auditor asking “did this control hold for the whole six months?” is asking for a timeline, and the runs are the timeline. A single screenshot taken on the last day of the period answers a different, weaker question.

Required and optional

A validation attached to a control is either required or optional. Required means the control cannot pass while the validation fails. Optional means the result is useful information and not a gate. Which one it is can be set at several levels — on the evidence type, on the Common control, or as an override on a single framework control — and the most specific setting wins. Inside one Common control, required beats optional.

Expiry

Evidence carries a date, and most of it carries an expiry. A penetration test from three years ago proves less than nothing, so Cybreeze tracks evidence as current, expiring or expired, and tells you before it lapses rather than after.

One file, several places

The same uploaded file can be attached to several controls, and an evidence record keeps its own version history. This is worth knowing before you delete anything: removing a file from one control does not mean no other control was relying on it.