The three kinds
The kind is chosen per control, and a single control can be backed by more than one Validation
at once (for example, “logging configured” and “logs reviewed this quarter”).
Checks: the detail inside a result
A real control usually bundles several distinct criteria. MFA enforcement, for instance, is really three questions: are all users enrolled, are privileged users enrolled, and is the method strong? Rather than collapse that into a single pass/fail, every Validation Run reports a list of Checks — each with its own status and, where relevant, a coverage number.Pass / Partial / FailEach Check is Pass (criterion met), Partial (met for some of
the population — e.g. 8 of 10 users), or Fail (not met). The Validation’s
overall verdict passes only when every Check passes.
You see exactly what’s left to fix instead of a bare “Fail”. Document and manual Validations
have fewer Checks — often just “present” and “in date”, or a single attestation line — but they
read the same way.
How a Validation runs (integration kind)
1
Trigger
The Validation runs on its schedule, or you press Run now on the control.
2
Fetch
The connected tool(s) are read through the integration — no credentials ever leave the
provider.
3
Merge
When more than one tool covers the same people, the records are matched into one canonical
list so a person counted twice isn’t judged twice.
4
Evaluate
The criteria are checked, producing the Checks, a coverage percentage, and the list of
failing items.
5
Result
A Validation Run is saved with everything above. It’s timestamped and kept as history.
How status rolls up
A control’s status is derived from the latest result of each of its Validations:- Implemented — the latest run passes (and any required evidence is present and in date).
- Failing — the latest run fails.
- At risk — the latest run has gone stale: its result aged out of the freshness window, or required evidence expired. Re-run or re-upload to clear it.
Examples across control types
The same machinery covers very different controls:Evidence vs ValidationsEvidence is a human-uploaded file you attach to a control. A
Validation is the check that proves the control — automatically, from a
document, or by attestation. A control is satisfied when its Validations pass and its required
Evidence is present and in date. See Managing evidence for
the evidence side.