Skip to main content
A Validation is a repeatable check that proves a control is actually in place. Some Validations run automatically against a connected tool; some watch for an uploaded document; some ask a person to confirm on a schedule. Each time a Validation runs it produces a Validation Run — a dated result you can open, and the building block of your audit history. This page explains the three kinds of Validations, the Checks inside a result, and how all of it rolls up into a control’s status.

The three kinds

The kind is chosen per control, and a single control can be backed by more than one Validation at once (for example, “logging configured” and “logs reviewed this quarter”).

Checks: the detail inside a result

A real control usually bundles several distinct criteria. MFA enforcement, for instance, is really three questions: are all users enrolled, are privileged users enrolled, and is the method strong? Rather than collapse that into a single pass/fail, every Validation Run reports a list of Checks — each with its own status and, where relevant, a coverage number.
Pass / Partial / FailEach Check is Pass (criterion met), Partial (met for some of the population — e.g. 8 of 10 users), or Fail (not met). The Validation’s overall verdict passes only when every Check passes.
A failing MFA run reads like this on the control page: You see exactly what’s left to fix instead of a bare “Fail”. Document and manual Validations have fewer Checks — often just “present” and “in date”, or a single attestation line — but they read the same way.

How a Validation runs (integration kind)

1

Trigger

The Validation runs on its schedule, or you press Run now on the control.
2

Fetch

The connected tool(s) are read through the integration — no credentials ever leave the provider.
3

Merge

When more than one tool covers the same people, the records are matched into one canonical list so a person counted twice isn’t judged twice.
4

Evaluate

The criteria are checked, producing the Checks, a coverage percentage, and the list of failing items.
5

Result

A Validation Run is saved with everything above. It’s timestamped and kept as history.

How status rolls up

A control’s status is derived from the latest result of each of its Validations:
  • Implemented — the latest run passes (and any required evidence is present and in date).
  • Failing — the latest run fails.
  • At risk — the latest run has gone stale: its result aged out of the freshness window, or required evidence expired. Re-run or re-upload to clear it.
When a control has several Validations, the worst one wins — every Validation must be healthy for the control to read Implemented. A Framework Control (e.g. an ISO clause) inherits the status of the Common control(s) it maps to, so fixing it once updates every framework that shares it.
Override when you mustIf a Validation can’t capture the full picture, an admin can manually mark a control Implemented with a reason — but only once supporting evidence is attached. The override is recorded in the activity log.

Examples across control types

The same machinery covers very different controls:
Evidence vs ValidationsEvidence is a human-uploaded file you attach to a control. A Validation is the check that proves the control — automatically, from a document, or by attestation. A control is satisfied when its Validations pass and its required Evidence is present and in date. See Managing evidence for the evidence side.